September · Granada, Andalusia, Spain

How to train for Badlands

Badlands is a self-supported gravel race from Granada that crosses the Gorafe and Tabernas deserts, the Cabo de Gata coast and the Sierra Nevada.

When: Usually starts in late August or early September.

Entries: Entries open for a short window in autumn, with a strict cap on riders; demand has exceeded the places available.

Distance, km
800
Elevation, m
16,000
Typical finish, hours
45–100
Preparation, weeks
24

What Badlands demands

Complete self-sufficiency on a fixed route that is mostly off-road, from desert lowlands to the high Sierra Nevada.

  • Self-supported & remote
  • Long mountain passes
  • Heat & exposed sectors
  • Chunky & loose gravel
  • High altitude

The course

  • Starts in Granada, at the Palacio de Congresos.
  • Crosses the Gorafe Desert, the Tabernas Desert, the Cabo de Gata coast and the Sierra Nevada.
  • Self-supported on a fixed route: riders must follow the official track, and if they leave it they must rejoin at the same point.
  • About 85% of the route is off-road, and both gravel and mountain bikes are allowed.
  • The highest point, in the Sierra Nevada, is about 3,212 m according to the organizer.

From the organizer's published course information and recent editions. Details can change between editions, so check the official site before you enter.

Routes (approximate, recent editions)

  • About 800 km and 16,000 m of climbing on one self-supported route

Key climbs & sectors

The organizer does not publish named climbs for this course.

Your preparation roadmap

24 weeks recommended. Each phase is a training plan of its own; together they lead into race day.

  1. Phase 1March–April

    Base training plan

    8 weeks progression

  2. Phase 2May–June

    Gravel training plan

    7 weeks progression

  3. Phase 3July–August

    Climbing training plan

    7 weeks progression

  4. Phase 4September

    Peak & Taper

    2 weeks progression

24 weeks · ends with the event in September

Badlands: 24-week plan

Register free to get a 24-week preparation preview for Badlands.

Build my planSave the plan to open the full 24-week schedule.

Winter on the trainer

Build ultra-distance aerobic durability and efficient low-intensity pedalling.

  • Indoor trainer

    Extended zone 2 block

    4x30 min at 70 to 75% FTP (zone 2), focusing on smooth pedalling.

  • Outdoor long ride

    Bikepacking test weekend

    Back-to-back 6-hour outdoor rides with fully loaded bags.

  • Indoor trainer

    Loaded climbing torque

    4x12 min at 55 rpm at 85% FTP, like climbing with a loaded bike.

  • Indoor trainer

    Heat training session

    75 min in a warm room at endurance pace (56 to 75% FTP), practising electrolyte intake; stop if you feel unwell.

Core indoor training blocks:FTP builder plan →

A plan that adapts to your life

Miss sessions, load too much or too little, string together hard days, sync new rides from Strava or Garmin, or change your FTP, and the plan rebuilds. Log illness or travel and it adapts to that too. Included with PRO AI.

Frequently asked questions

How hard is Badlands?

Complete self-sufficiency on a fixed route that is mostly off-road, from desert lowlands to the high Sierra Nevada. Listed routes: about 800 km, with about 16,000 m of climbing.

How many weeks do I need to train for Badlands?

This roadmap uses 24 weeks: Base training plan (8 weeks), Gravel training plan (7 weeks), Climbing training plan (7 weeks), then a 2-week taper in September. The emphasis follows the course: long self-sufficient days, sustained climbing power, fuelling and hydration in the heat, steady power on loose, rough surfaces, pacing at altitude.

Can I prepare for Badlands indoors on a trainer?

Build ultra-distance aerobic durability and efficient low-intensity pedalling. On the trainer: Extended zone 2 block, Loaded climbing torque, Heat training session. Outdoors, on gravel similar to the course: Bikepacking test weekend.

What are the key climbs and sectors of Badlands?

The organizer does not publish named climbs for this course. Terrain: Self-supported & remote, Long mountain passes, Heat & exposed sectors, Chunky & loose gravel, High altitude. Check the official site for the current course.

When do entries open for Badlands?

Entries open for a short window in autumn, with a strict cap on riders; demand has exceeded the places available. Usually starts in late August or early September. Entry details are on the official site: https://badlands.cc.

Related cycling events

May · Girona, Catalonia, Spain

The Traka

Mostly unpaved, rolling terrain with repeated climbs on low hills rather than long mountain passes. On the long route, steady power and fuelling over many hours matter most.

100–300 km · 1,350–4,150 m · 20 weeks prep

June · Emporia, Kansas, United States

Unbound Gravel

Long hours on rough Flint Hills gravel, where tyre choice, fuelling and pacing over a full day decide the result.

161–322 km · 1,800–2,740 m · 20 weeks prep

June · Steamboat Springs, Colorado, United States

SBT GRVL

Racing at altitude, with climbs above 7,000 feet, rewards aerobic efficiency and even pacing. On the Black course riders also need to average 10 mph to stay on the full route.

85–174 km · 1,280–2,496 m · 18 weeks prep

April · Del Mar, California, United States

Belgian Waffle Ride California

Frequent changes between tarmac and unpaved sectors of gravel, sand, doubletrack and singletrack call for punchy power and sharp bike handling.

103–172 km · 1,168–2,246 m · 18 weeks prep

TrainCraft is not affiliated with Badlands. Route figures and elevations are approximate and based on recent editions. Always verify current routes, dates and entry regulations on the official website.

Official Badlands website